summaryrefslogtreecommitdiff
path: root/TAO/tests/RTScheduling/Current/README
diff options
context:
space:
mode:
Diffstat (limited to 'TAO/tests/RTScheduling/Current/README')
-rw-r--r--TAO/tests/RTScheduling/Current/README63
1 files changed, 63 insertions, 0 deletions
diff --git a/TAO/tests/RTScheduling/Current/README b/TAO/tests/RTScheduling/Current/README
new file mode 100644
index 00000000000..83f2fdd84be
--- /dev/null
+++ b/TAO/tests/RTScheduling/Current/README
@@ -0,0 +1,63 @@
+//$Id$
+
+Case
+----
+
+This is a test of the various operations in the RTScheduling::Current
+Interface used to create and manage DTs. Four DTs are created. The
+following are the operations and cases tested:
+
+1. Out of context end_scheduling_segment () invocation.
+2. Out of context update_scheduling_segment () invocation.
+3. Creation of DT's consisting of nested scheduling segments using
+ begin_scheduling_segment () and end_scheduling_segment () operations.
+4. Retreiving DT Guid with Current::id () method.
+5. Listing the names of the scheduling segments using
+ current_scheduling_segment_names ().
+
+To Run
+------
+
+./test
+
+
+Typical Output
+--------------
+
+Making an end_scheduling_segment call without first calling begin_scheduling_segment
+Missing scheduling context OR DT cancelled
+(10205|1024) EXCEPTION, End Scheduling Segment is out of context
+system exception, ID 'IDL:omg.org/CORBA/BAD_INV_ORDER:1.0'
+TAO exception, minor code = 0 (unknown location; unspecified errno), completed = NO
+
+Making an update_scheduling_segment call without first calling begin_scheduling_segment
+(10205|1024) EXCEPTION, Update Scheduling Segment is out of context:
+system exception, ID 'IDL:omg.org/CORBA/BAD_INV_ORDER:1.0'
+TAO exception, minor code = 0 (unknown location; unspecified errno), completed = NO
+
+Starting Distributable Thread 1 with 3 nested scheduling segments....
+Starting Distributable Thread 2 with 3 nested scheduling segments....
+Segment Names for DT 1 :
+The Return of the King
+Two Towers
+Fellowship of the Rings
+Segment Names for DT 2 :
+DT 1 terminated ...
+The Return of the King
+Two Towers
+Fellowship of the Rings
+DT 2 terminated ...
+Starting Distributable Thread 3 with 3 nested scheduling segments....
+Segment Names for DT 3 :
+The Return of the King
+Two Towers
+Fellowship of the Rings
+DT 3 terminated ...
+Starting Distributable Thread 4 with 3 nested scheduling segments....
+Segment Names for DT 4 :
+The Return of the King
+Two Towers
+Fellowship of the Rings
+DT 4 terminated ...
+
+