diff options
Diffstat (limited to 'vendor/cloud.google.com/go/RELEASING.md')
-rw-r--r-- | vendor/cloud.google.com/go/RELEASING.md | 12 |
1 files changed, 6 insertions, 6 deletions
diff --git a/vendor/cloud.google.com/go/RELEASING.md b/vendor/cloud.google.com/go/RELEASING.md index d04176097d..6d0fcf4f9f 100644 --- a/vendor/cloud.google.com/go/RELEASING.md +++ b/vendor/cloud.google.com/go/RELEASING.md @@ -79,14 +79,14 @@ here is how to manually cut a release of `cloud.google.com/go`. [continuous Kokoro build](http://go/google-cloud-go-continuous). If there are any failures in the most recent build, address them before proceeding with the release. -1. Navigate to `google-cloud-go/` and switch to master. +1. Navigate to `google-cloud-go/` and switch to main. 1. `git pull` 1. Run `git tag -l | grep -v beta | grep -v alpha` to see all existing releases. The current latest tag `$CV` is the largest tag. It should look something like `vX.Y.Z` (note: ignore all `LIB/vX.Y.Z` tags - these are tags for a specific library, not the module root). We'll call the current version `$CV` and the new version `$NV`. -1. On master, run `git log $CV...` to list all the changes since the last +1. On main, run `git log $CV...` to list all the changes since the last release. NOTE: You must manually visually parse out changes to submodules [1] (the `git log` is going to show you things in submodules, which are not going to be part of your release). @@ -98,7 +98,7 @@ here is how to manually cut a release of `cloud.google.com/go`. and create a PR titled `chore: release $NV`. 1. Wait for the PR to be reviewed and merged. Once it's merged, and without merging any other PRs in the meantime: - a. Switch to master. + a. Switch to main. b. `git pull` c. Tag the repo with the next version: `git tag $NV`. d. Push the tag to origin: @@ -118,13 +118,13 @@ here is how to manually cut a release of a submodule. any failures in the most recent build, address them before proceeding with the release. (This applies even if the failures are in a different submodule from the one being released.) -1. Navigate to `google-cloud-go/` and switch to master. +1. Navigate to `google-cloud-go/` and switch to main. 1. `git pull` 1. Run `git tag -l | grep datastore | grep -v beta | grep -v alpha` to see all existing releases. The current latest tag `$CV` is the largest tag. It should look something like `datastore/vX.Y.Z`. We'll call the current version `$CV` and the new version `$NV`. -1. On master, run `git log $CV.. -- datastore/` to list all the changes to the +1. On main, run `git log $CV.. -- datastore/` to list all the changes to the submodule directory since the last release. 1. Edit `datastore/CHANGES.md` to include a summary of the changes. 1. In `internal/version` run `go generate`. @@ -132,7 +132,7 @@ here is how to manually cut a release of a submodule. and create a PR titled `chore(datastore): release $NV`. 1. Wait for the PR to be reviewed and merged. Once it's merged, and without merging any other PRs in the meantime: - a. Switch to master. + a. Switch to main. b. `git pull` c. Tag the repo with the next version: `git tag $NV`. d. Push the tag to origin: |