summaryrefslogtreecommitdiff
path: root/gcc/sched-int.h
diff options
context:
space:
mode:
authoraoliva <aoliva@138bc75d-0d04-0410-961f-82ee72b054a4>2011-01-25 22:27:51 +0000
committeraoliva <aoliva@138bc75d-0d04-0410-961f-82ee72b054a4>2011-01-25 22:27:51 +0000
commitce784932ff141417f806df6fca5254ca4be3f1bd (patch)
tree6a6de1f5b3d7fc3e205bef331cb55788bda819b7 /gcc/sched-int.h
parentcc7d06c4227ddff46d8ae50e1e7d5b1667f7243d (diff)
downloadgcc-ce784932ff141417f806df6fca5254ca4be3f1bd.tar.gz
PR debug/45136
PR debug/45130 * haifa-sched.c (get_ebb_head_tail): Move notes across boundary debug insns. (no_real_insns_p, schedule_block, set_priorities): Drop special treatment of boundary debug insns. * sched-deps.c (sd_init_insn, sd_finish_insn): Don't mark debug insns. * sched-ebb.c (schedule_ebbs): Don't skip debug insns. * sched-int.h (DEBUG_INSN_SCHED_P): Remove. (BOUNDARY_DEBUG_INSN_P): Likewise. (SCHEDULE_DEBUG_INSN_P): Likewise. * sched-rgn.c (init_ready_list): Drop special treatment of boundary debug insns. * final.c (rest_of_clean-state): Clear notes' BB. git-svn-id: svn+ssh://gcc.gnu.org/svn/gcc/trunk@169260 138bc75d-0d04-0410-961f-82ee72b054a4
Diffstat (limited to 'gcc/sched-int.h')
-rw-r--r--gcc/sched-int.h17
1 files changed, 0 insertions, 17 deletions
diff --git a/gcc/sched-int.h b/gcc/sched-int.h
index 68cfa23ee06..9077c881ce6 100644
--- a/gcc/sched-int.h
+++ b/gcc/sched-int.h
@@ -887,23 +887,6 @@ extern VEC(haifa_deps_insn_data_def, heap) *h_d_i_d;
#define IS_SPECULATION_BRANCHY_CHECK_P(INSN) \
(RECOVERY_BLOCK (INSN) != NULL && RECOVERY_BLOCK (INSN) != EXIT_BLOCK_PTR)
-/* The unchanging bit tracks whether a debug insn is to be handled
- like an insn (i.e., schedule it) or like a note (e.g., it is next
- to a basic block boundary. */
-#define DEBUG_INSN_SCHED_P(insn) \
- (RTL_FLAG_CHECK1("DEBUG_INSN_SCHED_P", (insn), DEBUG_INSN)->unchanging)
-
-/* True if INSN is a debug insn that is next to a basic block
- boundary, i.e., it is to be handled by the scheduler like a
- note. */
-#define BOUNDARY_DEBUG_INSN_P(insn) \
- (DEBUG_INSN_P (insn) && !DEBUG_INSN_SCHED_P (insn))
-/* True if INSN is a debug insn that is not next to a basic block
- boundary, i.e., it is to be handled by the scheduler like an
- insn. */
-#define SCHEDULE_DEBUG_INSN_P(insn) \
- (DEBUG_INSN_P (insn) && DEBUG_INSN_SCHED_P (insn))
-
/* Dep status (aka ds_t) of the link encapsulates information, that is needed
for speculative scheduling. Namely, it is 4 integers in the range
[0, MAX_DEP_WEAK] and 3 bits.