summaryrefslogtreecommitdiff
diff options
context:
space:
mode:
authorMek Stittri <mstittri@gitlab.com>2018-07-26 23:55:53 -0700
committerMek Stittri <mstittri@gitlab.com>2018-07-27 00:47:42 -0700
commit46a54123fc1f972f73002fe9c3f78963fe1e89ae (patch)
tree86488608ca705ece52c135f9fc4a05b1dcf61942
parent8cff6f8e92b2548cda9432c0731ab575b8fa0ccf (diff)
downloadgitlab-ce-46a54123fc1f972f73002fe9c3f78963fe1e89ae.tar.gz
Update scheduling language to be less descriptive
-rw-r--r--PROCESS.md12
1 files changed, 6 insertions, 6 deletions
diff --git a/PROCESS.md b/PROCESS.md
index 70214f1c194..5f50d472bd7 100644
--- a/PROCESS.md
+++ b/PROCESS.md
@@ -169,7 +169,7 @@ information, see
Once the stable branch is frozen, the only MRs that can be cherry-picked into
the stable branch are:
-* Fixes for [regressions](#regressions) where the affected version `xx.x` in `regression:xx.x` is the current release. See [Managing a regression](#managing-a-regression).
+* Fixes for [regressions](#regressions) where the affected version `xx.x` in `regression:xx.x` is the current release. See [Managing bugs](#managing-bugs) section.
* Fixes for security issues
* Fixes or improvements to automated QA scenarios
* Documentation updates for changes in the same release
@@ -228,7 +228,7 @@ Regressions should be considered high priority issues that should be solved as s
### Managing bugs
-**Prioritization:** We give higher priority to regressions which worked in the last recent monthly release and the current release candidates.
+**Prioritization:** We give higher priority to regressions on features that worked in the last recent monthly release and the current release candidates.
The two scenarios below can [bypass the exception request in the release process](https://gitlab.com/gitlab-org/release/docs/blob/master/general/exception-request/process.md#after-the-7th), where the affected regression version matches the current monthly release version.
* A regression which worked in the **Last monthly release**
* **Example:** In 11.0 we released a new `feature X` that is verified as working. Then in release 11.1 the feature no longer works, this is regression for 11.1. The issue should have the `regression:11.1` label.
@@ -246,15 +246,15 @@ When a bug is found:
1. Notify the respective Engineering Manager to evaluate and apply the [Severity label](../CONTRIBUTING.md#bug-severity-labels) and [Priority label](../CONTRIBUTING.md#bug-priority-labels).
The counterpart Product Manager is included to weigh-in on prioritization as needed.
1. If the ~bug is **NOT** a regression:
- 1. The Engineering Manager decides which milestone the bug will be fixed. The appropriate milestone is applied
+ 1. The Engineering Manager decides which milestone the bug will be fixed. The appropriate milestone is applied.
1. If the bug is a ~regression:
1. Determine the release that the regression affects and add the corresponding `regression:xx.x` label.
1. If the affected release version can't be determined, add the generic ~regression label for the time being.
- 1. If the affected version `xx.x` in `regression:xx.x` is the **current release**, schedule it for the current milestone as it should be fixed immediately.
+ 1. If the affected version `xx.x` in `regression:xx.x` is the **current release**, it's recommended to schedule the fix for the current milestone.
1. This falls under regressions which worked in the last release and the current RCs. More detailed explanations in the **Prioritization** section above.
1. If the affected version `xx.x` in `regression:xx.x` is older than the **current release**
- 1. If the regression is an ~S1 severity, schedule it to be fixed in the current milestone. We would like to fix the highest severity regression as soon as we can.
- 1. If the regression is an ~S2, ~S3 or ~S4 severity, the regression may be scheduled for later milestones at the discretion of Engineering Manager and Product Manager.
+ 1. If the regression is an ~S1 severity, it's recommended to schedule the fix for the current milestone. We would like to fix the highest severity regression as soon as we can.
+ 1. If the regression is an ~S2, ~S3 or ~S4 severity, the regression may be scheduled for later milestones at the discretion of the Engineering Manager and Product Manager.
## Release retrospective and kickoff