diff options
-rw-r--r-- | PROCESS.md | 16 |
1 files changed, 8 insertions, 8 deletions
diff --git a/PROCESS.md b/PROCESS.md index 965a3b62873..539cc4a243b 100644 --- a/PROCESS.md +++ b/PROCESS.md @@ -249,14 +249,14 @@ When a regression is found: 1. Label the issue properly, using the [team label](../CONTRIBUTING.md#team-labels), the [subject label](../CONTRIBUTING.md#subject-labels-wiki-container-registry-ldap-api-etc) and any other label that may apply in the specific case -1. Add the ~bug and ~regression labels -1. Evaluate the severity and add a [Severity label](https://gitlab.com/gitlab-org/gitlab-ce/blob/master/CONTRIBUTING.md#bug-severity-labels-s1-s2-s3-s4) -1. Evaluate the priority and add a [Priority label](https://gitlab.com/gitlab-org/gitlab-ce/blob/master/CONTRIBUTING.md#bug-priority-labels-p1-p2-p3-p4) -1. Schedule the issue in order to get it fixed as soon as possible, based on severity and priority, following these guidelines: - - If the regression is ~S1 or ~S2, set the current milestone - - If the regression was introduced in a RC of the current release, label with ~Deliverable - - If the regression was introduced in the previous release, label with ~"Next Patch Release" - - If the regression is ~S3 or ~S4, it can be scheduled for later milestones + + +1. Add the bug and regression labels +1. Notify the respective Engineering Manager to evaluate the Severity of the regression and add a [Severity label](https://gitlab.com/gitlab-org/gitlab-ce/blob/master/CONTRIBUTING.md#bug-severity-labels-s1-s2-s3-s4). The counterpart Product Manager is included to weigh-in on prioritization as needed to set the [Priority label](https://gitlab.com/gitlab-org/gitlab-ce/blob/master/CONTRIBUTING.md#bug-priority-labels-p1-p2-p3-p4). +1. If the regression is a ~S1 or ~S2, label the regression with the current milestone as it should be fixed in the current milestone. + 1. If the regression was introduced in an RC of the current release, label with ~Deliverable + 1. If the regression was introduced in the previous release, label with ~"Next Patch Release" +1. If the regression is a ~S3 or ~S4, the regression may be scheduled for later milestones at the discretion of Engineering Manager and Product Manager. When a new issue is found, the fix should start as soon as possible. You can ping the Engineering Manager or the Product Manager for the relative area to |