diff options
-rw-r--r-- | PROCESS.md | 21 |
1 files changed, 11 insertions, 10 deletions
diff --git a/PROCESS.md b/PROCESS.md index fd0c45f3b58..08b5751f3e9 100644 --- a/PROCESS.md +++ b/PROCESS.md @@ -208,7 +208,7 @@ A ~bug is a defect, error, failure which causes the system to behave incorrectly The level of impact of a ~bug can vary from blocking a whole functionality or a feature usability bug. A bug should always be linked to a severity level. -Refer to our [severity levels](https://gitlab.com/gitlab-org/gitlab-ce/blob/master/CONTRIBUTING.md#severity-labels) +Refer to our [severity levels](../CONTRIBUTING.md#severity-labels) Whether the bug is also a regression or not, the triage process should start as soon as possible. Ensure that the Engineering Manager and/or the Product Manager for the relative area is involved to prioritize the work as needed. @@ -228,7 +228,7 @@ Regressions should be considered high priority issues that should be solved as s ### Managing bugs -**Prioritization** We give higher priority to regressions that affected the last recent monthly release and the current release candidates. +**Prioritization:** We give higher priority to regressions which worked in the last recent monthly release and the current release candidates. The two scenarios below can [bypass the exception request in the release process](https://gitlab.com/gitlab-org/release/docs/blob/master/general/exception-request/process.md#after-the-7th), where the affected regression version matches the current monthly release version. * A regression which worked in the **Last monthly release** * **Example:** In 11.0 we released a new `feature X` that is verified as working. Then in release 11.1 the feature no longer works, this is regression for 11.1. The issue should have the `regression:11.1` label. @@ -243,17 +243,18 @@ When a bug is found: 1. Label the issue properly, using the [team label](../CONTRIBUTING.md#team-labels), the [subject label](../CONTRIBUTING.md#subject-labels) and any other label that may apply in the specific case -1. If the ~bug is a **regression**, add the ~regression label. -1. Notify the respective Engineering Manager to evaluate the Severity and add a [Severity label](https://gitlab.com/gitlab-org/gitlab-ce/blob/master/CONTRIBUTING.md#bug-severity-labels) and [Priority label](https://gitlab.com/gitlab-org/gitlab-ce/blob/master/CONTRIBUTING.md#bug-priority-labels). +1. Notify the respective Engineering Manager to evaluate and apply the [Severity label](../CONTRIBUTING.md#bug-severity-labels) and [Priority label](../CONTRIBUTING.md#bug-priority-labels). The counterpart Product Manager is included to weigh-in on prioritization as needed. +1. If the ~bug is a **regression**, determine the release that the regression affects and add the corresponding `regression:xx.x` label. + 1. If the affected release version can't be determined, add the generic ~regression label for the time being. 1. If the ~bug is **NOT** a regression: - 1. The Engineering Manager decides which milestone the bug will be fixed. The appropriate milestone is applied. + 1. The Engineering Manager decides which milestone the bug will be fixed. The appropriate milestone is applied. 1. If the bug is a ~regression: - 1. Determine the release that the regression affects. Add the corresponding `regression:xx.x` label. See **Prioritization** section above. - 1. If the affected version `xx.x` in `regression:xx.x` is the **Current release**, schedule it for the current milestone as it should be fixed in the current milestone. Scope it with ~Deliverable. - 1. If the affected version `xx.x` in `regression:xx.x` is older than the **Current release** - 1. If the regression is an ~S1 severity, label the regression with the current milestone as it should be fixed in the current milestone. Scope it with ~"Next Patch Release" or ~Stretch. - 1. If the regression is an ~S2, ~S3 or ~S4 severity, the regression may be scheduled for later milestones at the discretion of Engineering Manager and Product Manager. + 1. If the affected version `xx.x` in `regression:xx.x` is the **current release**, schedule it for the current milestone as it should be fixed immediately. + 1. This falls under regressions which worked in the last release and the current RCs. More detailed explanations in the **Prioritization** section above. + 1. If the affected version `xx.x` in `regression:xx.x` is older than the **current release** + 1. If the regression is an ~S1 severity, schedule it to be fixed in the current milestone. We would like to fix the highest severity regression as soon as we can. + 1. If the regression is an ~S2, ~S3 or ~S4 severity, the regression may be scheduled for later milestones at the discretion of Engineering Manager and Product Manager. ## Release retrospective and kickoff |