summaryrefslogtreecommitdiff
path: root/doc/release/monthly.md
blob: cfe01896d8fac30905a7ea7cf301aa8df793d39e (plain)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
# Monthly Release

NOTE: This is a guide used by the GitLab B.V. developers.

It starts 7 working days before the release.
The release manager doesn't have to perform all the work but must ensure someone is assigned.
The current release manager must schedule the appointment of the next release manager.
The new release manager should create overall issue to track the progress.

## Release Manager

A release manager is selected that coordinates all releases the coming month, including the patch releases for previous releases.
The release manager has to make sure all the steps below are done and delegated where necessary.
This person should also make sure this document is kept up to date and issues are created and updated.

## Take vacations into account

The time is measured in weekdays to compensate for weekends.
Do everything on time to prevent problems due to rush jobs or too little testing time.
Make sure that you take into account any vacations of maintainers.
If the release is falling behind immediately warn the team.

## Create an overall issue and follow it

Create issue for GitLab CE project(internal). Name it "Release x.x.x" for easier searching.
Replace the dates with actual dates based on the number of workdays before the release.
All steps from issue template are explained below

```
Xth: (7 working days before the 22nd)

- [ ] Code freeze
- [ ] Update the CE changelog (#LINK)
- [ ] Update the EE changelog (#LINK)
- [ ] Update the CI changelog (#LINK)
- [ ] Triage the omnibus-gitlab milestone

Xth: (6 working days before the 22nd)

- [ ] Merge CE master in to EE master via merge request (#LINK)
- [ ] Determine QA person and notify this person
- [ ] Check the tasks in [how to rc1 guide](howto_rc1.md) and delegate tasks if necessary
- [ ] Create CE, EE, CI RC1 versions (#LINK)

Xth: (5 working days before the 22nd)

- [ ] Do QA and fix anything coming out of it (#LINK)
- [ ] Close the omnibus-gitlab milestone
- [ ] Prepare the blog post (#LINK)

Xth: (4 working days before the 22nd)

- [ ] Update GitLab.com with rc1 (#LINK) (https://dev.gitlab.org/cookbooks/chef-repo/blob/master/doc/administration.md#deploy-the-package)
- [ ] Update ci.gitLab.com with rc1 (#LINK) (https://dev.gitlab.org/cookbooks/chef-repo/blob/master/doc/administration.md#deploy-the-package)
- [ ] Create regression issues (CE, CI) (#LINK)
- [ ] Tweet about rc1 (#LINK)

Xth: (3 working days before the 22nd)

- [ ] Merge CE stable branch into EE stable branch

Xth: (2 working days before the 22nd)

- [ ] Check that everyone is mentioned on the blog post (the reviewer should have done this one working day ago)
- [ ] Check that MVP is added to the mvp page (source/mvp/index.html in www-gitlab-com)

Xth: (1 working day before the 22nd)

- [ ] Create CE, EE, CI stable versions (#LINK)
- [ ] Create Omnibus tags and build packages
- [ ] Update GitLab.com with the stable version (#LINK)
- [ ] Update ci.gitLab.com with the stable version (#LINK)

22nd:

- [ ] Release CE, EE and CI (#LINK)

```

- - -

## Code Freeze

Stop merging code in master, except for important bug fixes

## Update changelog

Any changes not yet added to the changelog are added by lead developer and in that merge request the complete team is
asked if there is anything missing.

There are three changelogs that need to be updated: CE, EE and CI.

## Create RC1 (CE, EE, CI)

[Follow this How-to guide](howto_rc1.md) to create RC1.

## Prepare CHANGELOG for next release

Once the stable branches have been created, update the CHANGELOG in `master` with the upcoming version, usually X.X.X.pre.

## QA

Create issue on dev.gitlab.org `gitlab` repository, named "GitLab X.X QA" in order to keep track of the progress.

Use the omnibus packages created for RC1 of Enterprise Edition using [this guide](https://dev.gitlab.org/gitlab/gitlab-ee/blob/master/doc/release/manual_testing.md).

**NOTE** Upgrader can only be tested when tags are pushed to all repositories. Do not forget to confirm it is working before releasing. Note that in the issue.

#### Fix anything coming out of the QA

Create an issue with description of a problem, if it is quick fix fix it yourself otherwise contact the team for advice.

**NOTE** If there is a problem that cannot be fixed in a timely manner, reverting the feature is an option! If the feature is reverted,
create an issue about it in order to discuss the next steps after the release.

## Update GitLab.com with RC1

Use the omnibus EE packages created for RC1.
If there are big database migrations consider testing them with the production db on a VM.
Try to deploy in the morning.
It is important to do this as soon as possible, so we can catch any errors before we release the full version.

## Create a regressions issue

On [the GitLab CE issue tracker on GitLab.com](https://gitlab.com/gitlab-org/gitlab-ce/issues/) create an issue titled "GitLab X.X regressions" add the following text:

This is a meta issue to discuss possible regressions in this monthly release and any patch versions.
Please do not raise issues directly in this issue but link to issues that might warrant a patch release.
The decision to create a patch release or not is with the release manager who is assigned to this issue.
The release manager will comment here about the plans for patch releases.

Assign the issue to the release manager and at mention all members of gitlab core team. If there are any known bugs in the release add them immediately.

## Tweet about RC1

Tweet about the RC release:

> GitLab x.x.0.rc1 is out. This release candidate is only suitable for testing. Please link regressions issues from LINK_TO_REGRESSION_ISSUE

## Prepare the blog post

1. Start with a complete copy of the [release blog template](https://gitlab.com/gitlab-com/www-gitlab-com/blob/master/doc/release_blog_template.md) and fill it out.
1. Make sure the blog post contains information about the GitLab CI release.
1. Check the changelog of CE and EE for important changes.
1. Also check the CI changelog
1. Add a proposed tweet text to the blog post WIP MR description.
1. Create a WIP MR for the blog post
1. Ask Dmitriy (or a team member with OS X) to add screenshots to the WIP MR.
1. Decide with core team who will be the MVP user.
1. Create WIP MR for adding MVP to MVP page on website
1. Add a note if there are security fixes: This release fixes an important security issue and we advise everyone to upgrade as soon as possible.
1. Create a merge request on [GitLab.com](https://gitlab.com/gitlab-com/www-gitlab-com/tree/master)
1. Assign to one reviewer who will fix spelling issues by editing the branch (either with a git client or by using the online editor)
1. Comment to the reviewer: '@person Please mention the whole team as soon as you are done (3 workdays before release at the latest)'

## Create CE, EE, CI stable versions

Get release tools

```
git clone git@dev.gitlab.org:gitlab/release-tools.git
cd release-tools
```

Bump version, create release tag and push to remotes:

```
bundle exec rake release["x.x.0"]
```

This will create correct version and tag and push to all CE, EE and CI remotes.

Update [installation.md](/doc/install/installation.md) to the newest version in master.


## Create Omnibus tags and build packages

Follow the [release doc in the Omnibus repository](https://gitlab.com/gitlab-org/omnibus-gitlab/blob/master/doc/release.md).
This can happen before tagging because Omnibus uses tags in its own repo and SHA1's to refer to the GitLab codebase.

## Update GitLab.com with the stable version

- Deploy the package (should not need downtime because of the small difference with RC1)
- Deploy the package for ci.gitlab.com

## Release CE, EE and CI

__1. Publish packages for new release__

Update `downloads/index.html` and `downloads/archive/index.html` in `www-gitlab-com` repository.

__2. Publish blog for new release__

Doublecheck the everyone has been mentioned in the blog post.
Merge the [blog merge request](#1-prepare-the-blog-post) in `www-gitlab-com` repository.

__3. Tweet to blog__

Send out a tweet to share the good news with the world.
List the most important features and link to the blog post.

Proposed tweet "Release of GitLab X.X & CI Y.Y! FEATURE, FEATURE and FEATURE <link-to-blog-post> #gitlab"

Consider creating a post on Hacker News.

## Release new AMIs

[Follow this guide](https://dev.gitlab.org/gitlab/AMI/blob/master/README.md)

## Create a WIP blogpost for the next release

Create a WIP blogpost using [release blog template](https://gitlab.com/gitlab-com/www-gitlab-com/blob/master/doc/release_blog_template.md).