index
:
delta/gpsd.git
master
vla-removal
git.savannah.gnu.org: git/gpsd.git
summary
refs
log
tree
commit
diff
log msg
author
committer
range
path:
root
/
www
/
hacking.html.in
Commit message (
Expand
)
Author
Age
Files
Lines
*
Update hacking guide - PDAs are dead, long live smartphones.
Eric S. Raymond
2015-02-15
1
-8
/
+9
*
Repair website markup.
Eric S. Raymond
2015-02-14
1
-11
/
+12
*
A note on platforms.
Eric S. Raymond
2015-02-12
1
-3
/
+5
*
Against magic numbers.
Eric S. Raymond
2015-02-12
1
-0
/
+9
*
Style amwendment suggested by Geg Troxel.
Eric S. Raymond
2015-02-11
1
-2
/
+5
*
New Hacking Guide section on C, standards, and style.
Eric S. Raymond
2015-02-11
1
-53
/
+94
*
Assertions cleanup and new policy. All regression tests pass.
Eric S. Raymond
2015-01-30
1
-0
/
+37
*
Fix a bad thinko in the Hacking Guide.
Eric S. Raymond
2014-08-21
1
-4
/
+4
*
Don't cite by git hashes.
Eric S. Raymond
2014-08-21
1
-0
/
+7
*
Add a query to the Debian bug database.
Eric S. Raymond
2014-08-21
1
-1
/
+1
*
Documentation and FAQ updates.
Eric S. Raymond
2013-11-30
1
-3
/
+3
*
REmove some future-feature ideas that are done or obsolete.
Eric S. Raymond
2013-11-28
1
-18
/
+0
*
Minor documentation updates.
Eric S. Raymond
2013-11-18
1
-6
/
+2
*
dia is better and producing SVG than PNG.
Eric S. Raymond
2013-11-18
1
-1
/
+1
*
gpsmon display of PPS events is now a public feature.
Eric S. Raymond
2013-11-02
1
-5
/
+9
*
Update release sequence. All regression tests pass. PPS on Macx-1 is working.
Eric S. Raymond
2013-10-11
1
-7
/
+8
*
Update some documentation.
Eric S. Raymond
2013-10-10
1
-6
/
+4
*
Clean up some markup.
Eric S. Raymond
2013-04-30
1
-19
/
+21
*
Fix errors found by a web validator.
Eric S. Raymond
2013-02-25
1
-4
/
+5
*
Rebuild some binary-driver tests. Explain why this is needed.
Eric S. Raymond
2012-07-02
1
-0
/
+6
*
Update the release process.
Eric S. Raymond
2012-05-24
1
-3
/
+4
*
New item for release procedure.
Eric S. Raymond
2012-05-21
1
-1
/
+5
*
Update the release procedure.
Eric S. Raymond
2012-05-17
1
-4
/
+4
*
Staying Coverity-clean is now part of the release process.
Eric S. Raymond
2012-05-17
1
-1
/
+1
*
Markup fix.
Eric S. Raymond
2012-04-21
1
-0
/
+1
*
New Hacking Guide section on how to write support for new sentences.
Eric S. Raymond
2012-04-21
1
-0
/
+119
*
We no longer need to referes the RPPM spec on every release...
Eric S. Raymond
2012-01-12
1
-12
/
+8
*
More release machinery simplification.
Eric S. Raymond
2011-10-26
1
-7
/
+1
*
Improved documentation and diagnostics for flocktest.
Eric S. Raymond
2011-10-26
1
-1
/
+1
*
Finally I think we can get rid of the expliccit "rm -f revision.h".
Eric S. Raymond
2011-10-26
1
-7
/
+3
*
Improvements to build and releae-procedure documentation.
Eric S. Raymond
2011-10-26
1
-6
/
+6
*
Still trying to bulletproof the release procedure.
Eric S. Raymond
2011-10-26
1
-12
/
+10
*
Streamline the release procedure.
Eric S. Raymond
2011-10-26
1
-19
/
+12
*
Add instructions on updating the website as part of the release process.
Eric S. Raymond
2011-10-25
1
-1
/
+4
*
Reorder installation instructions to get revision.g right.
Eric S. Raymond
2011-10-25
1
-13
/
+13
*
Version bump, pychecker fixes and installation-procedure tweaks.
Eric S. Raymond
2011-10-25
1
-16
/
+19
*
Markup fix.
Eric S. Raymond
2011-10-12
1
-1
/
+1
*
Documentation needs the name changes too.
Eric S. Raymond
2011-10-07
1
-3
/
+3
*
Typo fixes, and fix a fossil from autotools.
Eric S. Raymond
2011-10-07
1
-8
/
+6
*
Website fixes and a better validation production.
Eric S. Raymond
2011-10-06
1
-19
/
+20
*
Documentation tweaks after migration to SCons.
Michael Tatarinov
2011-10-06
1
-5
/
+4
*
Documentation tweaks.
Eric S. Raymond
2011-10-05
1
-10
/
+11
*
Cosmetic tweak.
Michael Tatarinov
2011-10-05
1
-2
/
+2
*
Validation fix.
Eric S. Raymond
2011-10-05
1
-2
/
+3
*
More explanation of the diagram.
Eric S. Raymond
2011-10-05
1
-11
/
+15
*
Javascript datestamp.js must be included in block "Content".
Michael Tatarinov
2011-10-05
1
-1
/
+2
*
More explanation of possible clock drift.
Eric S. Raymond
2011-10-05
1
-3
/
+9
*
More detailed timing diagram.
Eric S. Raymond
2011-10-05
1
-9
/
+20
*
A diagram of the reporting cycle.
Eric S. Raymond
2011-10-05
1
-10
/
+18
*
More explanation of profiling.
Eric S. Raymond
2011-10-05
1
-15
/
+45
[next]