summaryrefslogtreecommitdiff
path: root/Tests/RunCMake/include_external_msproject
diff options
context:
space:
mode:
authorBrad King <brad.king@kitware.com>2019-01-09 14:30:10 -0500
committerBrad King <brad.king@kitware.com>2019-01-11 11:04:51 -0500
commit57e48f16f2c3b73fb27057267c8092a41005bb75 (patch)
treea4ffcf1bb1bcb8186ca7504cadd1ad5618852f50 /Tests/RunCMake/include_external_msproject
parentbdef729646a5a559c295ef9c0fb83eb8a6b34905 (diff)
downloadcmake-57e48f16f2c3b73fb27057267c8092a41005bb75.tar.gz
VS: Add Visual Studio 16 2019 generator
Add this generator *without* support for specifying the target architecture in the generator name. cmake-gui will be taught to provide a field for this, and command-line builds can use -A. Also, teach this generator to select a default target architecture based on the host architecture. Fixes: #18689 Inspired-by: Egor Pugin <egor.pugin@gmail.com>
Diffstat (limited to 'Tests/RunCMake/include_external_msproject')
-rw-r--r--Tests/RunCMake/include_external_msproject/check_utils.cmake2
1 files changed, 2 insertions, 0 deletions
diff --git a/Tests/RunCMake/include_external_msproject/check_utils.cmake b/Tests/RunCMake/include_external_msproject/check_utils.cmake
index e9e9cac72a..0a2ba63f5a 100644
--- a/Tests/RunCMake/include_external_msproject/check_utils.cmake
+++ b/Tests/RunCMake/include_external_msproject/check_utils.cmake
@@ -100,6 +100,8 @@ function(check_project test name guid type platform imported_release_config_name
set(platform "${RunCMake_GENERATOR_PLATFORM}")
elseif("${RunCMake_GENERATOR}" MATCHES "Win64")
set(platform "x64")
+ elseif(VS_PLATFORM_NAME)
+ set(platform "${VS_PLATFORM_NAME}")
else()
set(platform "Win32")
endif()