diff options
Diffstat (limited to 'doc/operations/incident_management/linked_resources.md')
-rw-r--r-- | doc/operations/incident_management/linked_resources.md | 66 |
1 files changed, 66 insertions, 0 deletions
diff --git a/doc/operations/incident_management/linked_resources.md b/doc/operations/incident_management/linked_resources.md new file mode 100644 index 00000000000..d2254a30f91 --- /dev/null +++ b/doc/operations/incident_management/linked_resources.md @@ -0,0 +1,66 @@ +--- +stage: Monitor +group: Respond +info: To determine the technical writer assigned to the Stage/Group associated with this page, see https://about.gitlab.com/handbook/engineering/ux/technical-writing/#assignments +--- + +# Linked resources in incidents **(PREMIUM)** + +> [Introduced](https://gitlab.com/gitlab-org/gitlab/-/issues/230852) in GitLab 15.3 [with a flag](../../administration/feature_flags.md) named `incident_resource_links_widget`. Enabled on GitLab.com. Disabled on self-managed. + +FLAG: +On self-managed GitLab, by default this feature is not available. To make it available, ask an administrator to [enable the feature flag](../../administration/feature_flags.md) named `incident_resource_links_widget`. +On GitLab.com, this feature is available. + +To help your team members find the important links without having to search through many comments, +you can add linked resources to an incident issue. + +Resources you might want link to: + +- Zoom meetings +- Slack channels or threads +- Google Docs + +## View linked resources of an incident + +Linked resources for an incident are listed under the **Summary** tab. + +![Linked resources list](img/linked_resources_list_v15_3.png) + +To view the linked resources of an incident: + +1. On the top bar, select **Menu > Projects** and find your project. +1. On the left sidebar, select **Monitor > Incidents**. +1. Select an incident. + +## Add a linked resource + +Add a linked resource manually from an incident. + +Prerequisites: + +- You must have at least the Reporter role for the project. + +To add a linked resource: + +1. On the top bar, select **Menu > Projects** and find your project. +1. On the left sidebar, select **Monitor > Incidents**. +1. Select an incident. +1. In the **Linked resources** section, select the plus icon (**{plus-square}**). +1. Complete the required fields. +1. Select **Add**. + +## Remove a linked resource + +You can also remove a linked resource. + +Prerequisities: + +- You must have at least the Reporter role for the project. + +To remove a linked resource: + +1. On the top bar, select **Menu > Projects** and find your project. +1. On the left sidebar, select **Monitor > Incidents**. +1. Select an incident. +1. In the **Linked resources** section, select **Remove** (**{close}**). |