diff options
author | Sylvain Bauza <sbauza@redhat.com> | 2022-11-29 17:49:33 +0100 |
---|---|---|
committer | Sylvain Bauza <sbauza@redhat.com> | 2022-11-29 18:08:55 +0100 |
commit | b8f0c30f9c9aa67032d04a6fd263b90fd540421b (patch) | |
tree | 46d3f8c6cec6e4931eece58062c9a7b20a3854ce /zuul.d | |
parent | 96cd444cac4a0d2d1db619365f645a60c3de73a5 (diff) | |
download | tempest-b8f0c30f9c9aa67032d04a6fd263b90fd540421b.tar.gz |
zuul: Increase timeout for c9s-fips job
tempest-centos9-stream-fips job has a long history of runs resulting to
TIMED_OUT [1]
Since the job defines some extra tasks for enabling FIPS, we hardly hit
the default timeout of 2 hours as shown in every failing build log.
If we really want this job, then we need to give it some extra space as
for the moment, apart from wasting CI resources into continuously failing
runs, we don't see any interest in it.
[1] https://zuul.openstack.org/builds?job_name=tempest-centos9-stream-fips
Change-Id: I5b04d69f74854725e0c11abe58e936fc6d18d183
Diffstat (limited to 'zuul.d')
-rw-r--r-- | zuul.d/integrated-gate.yaml | 1 |
1 files changed, 1 insertions, 0 deletions
diff --git a/zuul.d/integrated-gate.yaml b/zuul.d/integrated-gate.yaml index 121e04dfa..3ce4f2575 100644 --- a/zuul.d/integrated-gate.yaml +++ b/zuul.d/integrated-gate.yaml @@ -324,6 +324,7 @@ parent: devstack-tempest description: | Integration testing for a FIPS enabled Centos 9 system + timeout: 10800 nodeset: devstack-single-node-centos-9-stream pre-run: playbooks/enable-fips.yaml vars: |