diff options
author | Jim Meyering <meyering@redhat.com> | 2010-06-07 09:06:42 +0200 |
---|---|---|
committer | Jim Meyering <meyering@redhat.com> | 2010-06-07 09:06:42 +0200 |
commit | 8db9005b853ad5ae52682c8f3ab35192ee0fdcda (patch) | |
tree | c8217e4281e4122ca85379fbfb4327129b6af9f7 /build-aux/do-release-commit-and-tag | |
parent | 7873eb96d23bb7d369a0ac6cd5f8e811b0147bfd (diff) | |
download | gnulib-8db9005b853ad5ae52682c8f3ab35192ee0fdcda.tar.gz |
do-release-commit-and-tag: fix typo in --help
* build-aux/do-release-commit-and-tag (Usage): Fix typo in --help.
Diffstat (limited to 'build-aux/do-release-commit-and-tag')
-rwxr-xr-x | build-aux/do-release-commit-and-tag | 4 |
1 files changed, 2 insertions, 2 deletions
diff --git a/build-aux/do-release-commit-and-tag b/build-aux/do-release-commit-and-tag index 353c4601bd..c02d82d07d 100755 --- a/build-aux/do-release-commit-and-tag +++ b/build-aux/do-release-commit-and-tag @@ -3,7 +3,7 @@ # controlled .prev-version file, automate the procedure by which we record # the date, release-type and version string in the NEWS file. That commit # will serve to identify the release, so apply a signed tag to it as well. -VERSION=2009-11-06.10 # UTC +VERSION=2010-06-07.07 # UTC # Note: this is a bash script (could be zsh or dash) @@ -37,7 +37,7 @@ Usage: $ME VERSION RELEASE_TYPE Run this script to perform the final pre-release NEWS update in which the date, release-type and version string are recorded. Commit that result with a log entry marking the release, and apply -a signed tag. Run it from your project's the top-level directory. +a signed tag. Run it from your project's top-level directory. Requirements: - you use git for version-control |