summaryrefslogtreecommitdiff
path: root/build-aux/do-release-commit-and-tag
diff options
context:
space:
mode:
Diffstat (limited to 'build-aux/do-release-commit-and-tag')
-rwxr-xr-xbuild-aux/do-release-commit-and-tag4
1 files changed, 2 insertions, 2 deletions
diff --git a/build-aux/do-release-commit-and-tag b/build-aux/do-release-commit-and-tag
index 353c4601bd..c02d82d07d 100755
--- a/build-aux/do-release-commit-and-tag
+++ b/build-aux/do-release-commit-and-tag
@@ -3,7 +3,7 @@
# controlled .prev-version file, automate the procedure by which we record
# the date, release-type and version string in the NEWS file. That commit
# will serve to identify the release, so apply a signed tag to it as well.
-VERSION=2009-11-06.10 # UTC
+VERSION=2010-06-07.07 # UTC
# Note: this is a bash script (could be zsh or dash)
@@ -37,7 +37,7 @@ Usage: $ME VERSION RELEASE_TYPE
Run this script to perform the final pre-release NEWS update
in which the date, release-type and version string are recorded.
Commit that result with a log entry marking the release, and apply
-a signed tag. Run it from your project's the top-level directory.
+a signed tag. Run it from your project's top-level directory.
Requirements:
- you use git for version-control